Product Description
This product is a two-component, hand-scraped polyurethane runway material. It's made by reacting isocyanate and polyether polyol in a certain proportion, adding some reinforcing agents and other additives. This product has excellent mechanical properties, good leveling, overall film formation, continuous, dense, seamless coating, beautiful and practical.
Detailed Photos
Product Features
. Room temperature curing.
. Excellent physical and chemical properties, good adhesion to all types of substrates.
. Convenient construction, extremely high efficiency, one-time construction can meet the design thickness requirements.
. Use manual scraping or rolling construction, simple, convenient and controllable
Product Parameters
Test data |
YP-211 |
YP-191 |
Appearance |
Red viscous liquid |
Colorless transparent liquid |
Viscosity/30ºC |
20000-30000Mpa·s |
3500-4000Mpa·s |
NCO value/% |
/ |
7.5±0.2 |
Operation time |
0.5-2h (the higher the temperature, the shorter the operation time) |
Curing time |
18-72h (the higher the temperature and humidity, the shorter the time, and vice versa) |
Tensile strength |
1.0-1.5Mpa |
Elongation at break |
100-150% |
Packaging & Shipping
Storage and transportation
The materials should be sealed and stored in a dry, cool, well-ventilated environment, avoid sun and rain, and stay away from fire.
Under the original packaging state and specified storage conditions, the shelf life of this product is 6 months from the date of production. If the storage period exceeds the storage period, it can be inspected according to the items specified in this product standard. If it meets the technical requirements, it can still be used. Please use it as soon as possible after opening, and it must be resealed and stored when not in use.
During transportation, rain and sun exposure should be strictly prohibited, and violent collisions should be avoided. The materials should be stacked neatly and stably, and should comply with the relevant regulations of the transportation department.
Installation Instructions
Surface requirements: The concrete surface should be cleaned, repaired and polished to a certain degree of roughness. Ensure that the concrete is fully cured, the strength reaches C25 or above, and the moisture content is less than 8%. After the surface is treated, the next process should be carried out as soon as possible.
Ambient temperature and humidity requirements: The ambient temperature at the construction site should be higher than 5°C, and the relative humidity should be less than 85% before construction can be carried out.
Ventilation conditions: Ventilation should be maintained during construction.








FAQ
1. Are you manufacturer or trader?
We are manufacturer with a long history since 2009 ,we are focus on materials of surface engineering .
2.What is the advantage of your factory? Why should I choose you?
A:Our products are odorless and non-toxic
B:We have more than 10 years' development and production history
C:We have a professional construction team with Rich construction experience, we can help you to do technical guidance
3.What is guarantee time of your products? 10 years
4.What is your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
5. What is your terms of delivery?
EXW, FOB, CFR, CIF, DDU.
6. Worried about if our production Suitable for Your local environment ?
No need worry ,just give us Detailed local environmental and climate data(temperature,humidity)
We will fine-tune the recipe according to specific data,Produce products that suit your needs.