Customization: | Available |
---|---|
Color: | Customized Color |
Appearance: | Liquid |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
SRT-A/B Self-Leveling Cold Polyurea Floor Material
Item | SRT-A/B |
Solid Content % | 100 |
Work time(min) | 10-15 mins |
Tensile strength | 13Mpa |
Elongation | ≥100% |
Adhesion (pull) Mpa | 2Mpa |
Hardness shore A | D60 |
Surface dry time (h) | ≤8 |
Actual dry time(h) | ≤24 |
Akron abrasion (cm3) | 0.15 |
1. Indoor floors, terraces, balconies, corridors, and other environments.
2. Parking lot floor
3. Silent flooring for schools, hospitals, etc., dust-free workshop flooring, anti-corrosion flooring for production workshops, and anti-corrosion and wear-resistant protection for warehouse flooring.
4. Micro elastic silent self leveling floor and impact resistant self leveling floor.
A: 15kgs/drum; B: 5kgs/drum
1. Material Preparation
Pour Component B into a mixing bucket and add Component A by weight in proportion. Mix thoroughly for 2-3 minutes to avoid uneven mixing or incomplete solidification. Use the prepared polyurea self-leveling material within 15 minutes, pouring it directly onto the foundation to prevent rapid solidification in the bucket.
2. Primer and Self-Leveling Application
Polish the surface for interlayer adhesion and clean dust with a vacuum cleaner. Apply solvent-free epoxy primer evenly with a roller. After curing, mix the polyurea material in proportion, pour it onto the floor, and spread evenly with a trowel (choose 3mm or 5mm based on thickness needs).
3. Topcoat Application
After 12 hours of surface drying, mix Topcoat A and B thoroughly for 2-3 minutes. Use a non-shedding roller to apply evenly (approx. 0.2 kg/m²). Follow "dedicated personnel for preparation" and use the material within 30 minutes.
4. Construction Tools
Dust-free grinder, vacuum cleaner, trowel, mixer, roller, and protective tape.
5. Precautions
Apply protective tape for clean edges and keep tools clean. Avoid construction at summer nights to prevent insects from affecting the finish. Do not pour leftover material into the sewer. No smoking at the site. Allow at least 7 days for the paint film to fully cure for optimal performance.
Suggested Use QTY
1.2kg/mm/m2,
Thickness ≥ 1.5mm, single square dosage ≥ 1.8kg.
Thickness ≥ 2.0mm, single square dosage ≥ 2.4kg
FAQ
1. What products does your company specialize in?
We specialize in plastic running track materials and polyurea products. Our running track materials, made from high-quality PU and EPDM rubber, are durable, elastic, and eco-friendly, ideal for sports fields and schools. We also offer spray polyurea, brushable polyurea, self-leveling polyurea, and polyaspartic coatings for waterproofing, flooring, and corrosion protection.
2. Do you offer customized solutions?
Yes, we provide customized formulations and construction solutions tailored to meet specific project requirements.
3. Are your products environmentally friendly?
Absolutely. All our products comply with international environmental standards, using eco-friendly raw materials that are non-toxic and pollution-free.
4. What are the main applications of polyurea?
Polyurea is ideal for roofing waterproofing, industrial equipment anti-corrosion, tunnel lining, sewage tanks, and parking lots. It provides excellent durability, waterproofing, and corrosion resistance.
5. What is the difference between brushable and spray polyurea?
Brushable polyurea is designed for small or intricate areas, offering easy application. Spray polyurea is better suited for large areas, ensuring high efficiency and uniform coatings.
6. Can your polyurea withstand extreme temperatures?
Yes, our polyurea products perform well under extreme conditions, maintaining stability from -40°C to 120°C.
7. Do your products resist chemical corrosion?
Yes, our polyurea has strong resistance to acids, alkalis, and salts, making it suitable for chemical plants, wastewater treatment facilities, and other harsh environments.
8. How soon can polyurea self-leveling be put into use after application?
The surface usually dries and forms a film within 4 hours, with full curing completed in 12 hours. For optimal performance, it is recommended to allow at least 7 days of curing. During this period, avoid heavy loads or high-intensity use to prevent compromising the coating quality.
9. Do you provide technical support for application?
Yes, we offer comprehensive technical support, including training, on-site guidance, and optimized solutions for your projects.