|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Color: | Grey |
| Appearance: | Liquid |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This product is a two-component, hand-scraped polyurethane runway material. It's made by reacting isocyanate and polyether polyol in a certain proportion, adding some reinforcing agents and other additives. This product has excellent mechanical properties, good leveling, overall film formation, continuous, dense, seamless coating, beautiful and practical.
Product Features| Test data | YP-211 | YP-191 |
| Appearance | Red viscous liquid | Colorless transparent liquid |
| Viscosity/30ºC | 20000-30000Mpa·s | 3500-4000Mpa·s |
| NCO value/% | / | 7.5±0.2 |
Operation time |
0.5-2h (the higher the temperature, the shorter the operation time) |
| Curing time | 18-72h (the higher the temperature and humidity, the shorter the time, and vice versa) |
| Tensile strength | 1.0-1.5Mpa |
| Elongation at break | 100-150% |
Surface requirements: The concrete surface should be cleaned, repaired and polished to a certain degree of roughness. Ensure that the concrete is fully cured, the strength reaches C25 or above, and the moisture content is less than 8%. After the surface is treated, the next process should be carried out as soon as possible.
Ambient temperature and humidity requirements: The ambient temperature at the construction site should be higher than 5°C, and the relative humidity should be less than 85% before construction can be carried out.
Ventilation conditions: Ventilation should be maintained during construction.






