Customization: | Available |
---|---|
CAS No.: | 9003-11-6 |
Formula: | C5h10o2 |
Still deciding? Get samples of US$ 4/kg
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Two Components Brushable Cold Polyurea
Product Parameters
Item Number | YP683/YP685 |
Solid Content % | 100 |
Work time(min) | 10-15 mins |
Surface dry time (h) | <4 |
Actual dry time(h) | <24 |
Hardness(Shore A) | 80 |
Tensile strength (MPa) | 7-8 Mpa |
Elongation at break (%) | 300 |
Tear strength | 40N/m2 |
Adhesion (pull)Mpa | 2Mpa |
Applications
1) Waterproofing protection for roofs, swimming pools, water parks, etc;
2) Production workshop anti-corrosion flooring and warehouse floor anti-corrosion and wear-resistant protection;
3) Silent floors in schools, hospitals, kindergartens, and dust-free workshop floors;
4) Can board sports venues such as basketball courts.
Packing
A: 20kgs/drum B:20 kgs/drum
Storage
Sealed storage of coatings in dry, cool, and well ventilated conditions, avoiding sunlight and rain, and keeping away from sources of fire.
Construction Conditions
1. Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
2. Environmental temperature and humidity requirements: The environmental temperature at the construction site should be above 5 ºC, and construction can only be carried out when the relative humidity is less than 85%.
3. Ventilation conditions: Ventilation should be maintained during construction.